Job Summary: Raised cabinets and microwave 9 inches, Designed, built and installed crown moulding, Built and installed open shelf below cabinets, above fridge and in bathroom above toilet. Click here to see Carla's Kitchen part 1.
Job Summary: Took down and relocated cabinet boxes, built one new cabinet box, designed and built new drawer front and cabinet doors, hung new doors and fixed drawers and installed drawer fronts, painted cabinets, installed hardware and over stove microwave.
BEFORE
DURING
(almost done) AFTER
This kitchen will be finished with new counter tops and a new stove. Complete finished pictures will be posted at a later time.
Job Summary: Removed 3 deteriorating fence posts, cleaned fence post holes, installed new posts and attached to house foundation, and reinstalled fence.
Job Summary: Installed Dura-rock cement board, prepared the surface with a water sealant and leveled the walls. Installed vertical white 6 inch tile, grouted and caulked, and installed shower curtain rod, .