Wednesday, August 4, 2010

Carla's Kitchen Part 2

Job Summary: Raised cabinets and microwave 9 inches, Designed, built and installed crown moulding, Built and installed open shelf below cabinets, above fridge and in bathroom above toilet. Click here to see Carla's Kitchen part 1.

BEFORE



AFTER





Megan's Bench

Job Summary: Measured for and designed built-in bench with under-seat storage, Built, painted and installed bench and wall mouldings.


BEFORE

DURING


(almost done) AFTER

This needed one more coat of paint on the wall and mouldings when this picture was taken. The seats on the bench lift to reveal storage underneath.

Megan's Deck

Job Description: Installed exterior slate tile, Made and installed base boards, Designed and constructed pillars








Kim's Kitchen

Job Summary: Took down and relocated cabinet boxes, built one new cabinet box, designed and built new drawer front and cabinet doors, hung new doors and fixed drawers and installed drawer fronts, painted cabinets, installed hardware and over stove microwave.


BEFORE




DURING








(almost done) AFTER





This kitchen will be finished with new counter tops and a new stove. Complete finished pictures will be posted at a later time.

Saturday, July 17, 2010

Glades Fence

Job Summary: Removed 3 deteriorating fence posts, cleaned fence post holes, installed new posts and attached to house foundation, and reinstalled fence.



Thursday, June 17, 2010

Challis Shower

Job Summary: Installed Dura-rock cement board, prepared the surface with a water sealant and leveled the walls. Installed vertical white 6 inch tile, grouted and caulked, and installed shower curtain rod, .
BEFORE
DURING
AFTER

Sunday, May 23, 2010

Brock's Banister

Job Summary - Pulled out old banister and handrails. Stained all oak handrails and newel post. Installed new newel post, handrails, and balusters.


BEFORE







AFTER