BEFORE
Wednesday, August 4, 2010
Carla's Kitchen Part 2
Job Summary: Raised cabinets and microwave 9 inches, Designed, built and installed crown moulding, Built and installed open shelf below cabinets, above fridge and in bathroom above toilet. Click here to see Carla's Kitchen part 1.
Megan's Bench
Job Summary: Measured for and designed built-in bench with under-seat storage, Built, painted and installed bench and wall mouldings.
This needed one more coat of paint on the wall and mouldings when this picture was taken. The seats on the bench lift to reveal storage underneath.
BEFORE
This needed one more coat of paint on the wall and mouldings when this picture was taken. The seats on the bench lift to reveal storage underneath.
Megan's Deck
Job Description: Installed exterior slate tile, Made and installed base boards, Designed and constructed pillars
Kim's Kitchen
Job Summary: Took down and relocated cabinet boxes, built one new cabinet box, designed and built new drawer front and cabinet doors, hung new doors and fixed drawers and installed drawer fronts, painted cabinets, installed hardware and over stove microwave.
This kitchen will be finished with new counter tops and a new stove. Complete finished pictures will be posted at a later time.
BEFORE
This kitchen will be finished with new counter tops and a new stove. Complete finished pictures will be posted at a later time.
Labels:
cabinet doors,
cabinets,
demolition,
designing,
drawer fronts,
drawers,
installation,
kitchen,
microwave,
painting
Saturday, July 17, 2010
Glades Fence
Thursday, June 17, 2010
Challis Shower
Job Summary: Installed Dura-rock cement board, prepared the surface with a water sealant and leveled the walls. Installed vertical white 6 inch tile, grouted and caulked, and installed shower curtain rod, .
BEFORE
Sunday, May 23, 2010
Brock's Banister
Subscribe to:
Posts (Atom)